ITAC Assessment: WI0266
ITAC logo
ITAC Assessment: WI0266
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Forgings (tractor/off road)
NAICS
n/a
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 175,000
ft2
Annual Production 500
pieces
Production Hrs. Annual 3,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,737 2,820,926
kWh
Electricity Demand $85,652 11,487
kW-mo/yr
Electricity Fees $(-2,579.0) -
Natural Gas $536,714 220,801
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,840 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,780

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.1242: Minimize boiler blowdown with better feedwater treatment $6,680 $2,500 - - $2,790
-
MMBtu
$2,280 $1,610
-
Tgal
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,481 $30,000 $8,646
315,651
kWh
$6,572
-
kW-mo/yr
$(-8,737.0)
-
MMBtu
- -
03 2.4221: Install compressor air intakes in coolest locations $1,572 $1,280 $848
31,067
kWh
$724
-
kW-mo/yr
- - -
04 2.2437: Recover waste heat from equipment $899 $600 - - $899
-
MMBtu
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $2,072 $1,800 - - $2,072
-
MMBtu
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $150 $250 - - $150
-
MMBtu
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,546 $1,220 $696
25,498
kWh
$850
-
kW-mo/yr
- - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $440 - $197
7,327
kWh
$243
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $19,840 $37,650 $10,387
379,543
kWh
$8,389
-
kW-mo/yr
$(-2,826.0)
-
MMBtu
$2,280 $1,610
-
Tgal
TOTAL IMPLEMENTED $5,780 $4,550 $1,741
63,892
kWh
$1,817
-
kW-mo/yr
$2,222
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs