ITAC Assessment: KU0050
ITAC logo
ITAC Assessment: KU0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product ZINC DIECASTINGS
NAICS
n/a
SIC 3369: Nonferrous Foundries, Except Aluminum and Copper
Sales Range $1
M
to 5
M
# of Employees 120
Plant Area
n/a
Annual Production 1,023
ton
Production Hrs. Annual 6,072
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,241 2,616,940
kWh
Natural Gas $156,802 58,294
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $133,927 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $133,927

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,836 $4,009 $2,836
57,444
kWh
-
02 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $118,344 $10,000 - $118,344
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $1,013 $1,000 - $1,013
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $11,254 $3,000 - $11,254
-
MMBtu
05 2.2135: Repair and eliminate steam leaks $480 $2,500 - $480
-
MMBtu
TOTAL RECOMMENDED $133,927 $20,509 $2,836
57,444
kWh
$131,091
-
MMBtu
TOTAL IMPLEMENTED $133,927 $20,509 $2,836
57,444
kWh
$131,091
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs