ITAC Assessment: KU0546
ITAC logo
ITAC Assessment: KU0546
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product canned pet food
NAICS
n/a
SIC 2047: Dog and Cat Food
Sales Range $100
M
to 500
M
# of Employees 342
Plant Area 450,000
ft2
Annual Production 263,000
ton
Production Hrs. Annual 5,832
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $361,271 20,119,274
kWh
Electricity Demand $446,320 40,838
kW-mo/yr
Electricity Fees $18,255 -
Natural Gas $718,703 302,283
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $526,940 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,370

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $431,791 $2,400,000 $335,405
18,393,904
kWh
$414,110
-
kW-mo/yr
$(-317,724.0)
-
MMBtu
-
02 2.4322: Use or replace with energy efficient substitutes $74,779 $244,140 $20,799
1,136,578
kWh
$23,010
-
kW-mo/yr
- $30,970
03 2.3212: Optimize plant power factor $17,000 $9,570 - $17,000
-
kW-mo/yr
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,500 $1,000 - - $2,500
-
MMBtu
-
05 2.2437: Recover waste heat from equipment $870 $740 - - $870
-
MMBtu
-
TOTAL RECOMMENDED $526,940 $2,655,450 $356,204
19,530,482
kWh
$454,120
-
kW-mo/yr
$(-314,354.0)
-
MMBtu
$30,970
TOTAL IMPLEMENTED $3,370 $1,740 - - $3,370
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs