Assessment Year | 1996 |
---|---|
Principal Product | Hydraulic Control Valves |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 450 |
Plant Area |
220,000
ft2
|
Annual Production | 108,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $575,038 | 11,533,119 |
kWh
|
$0.050 |
Electricity Demand | $215,774 | 25,003 |
kW-mo/yr
|
$8.63 |
Electricity Fees | $(-2,720.0) | - |
|
- |
Natural Gas | $49,908 | 11,144 |
MMBtu
|
$4.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $70,970 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,012 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $24,500 | $25,000 | - | - | - | - |
$24,500
-
gal
|
- | |
02 | 3.3132: Use reverse osmosis to concentrate material | $19,300 | $35,025 | - | - | - |
$19,300
-
Tgal
|
- | - | |
03 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $13,875 | $5,000 | - | - | - | - | - | $13,875 | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $4,744 | - | - | - |
$4,744
-
MMBtu
|
- | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $3,392 | $960 |
$2,051
68,581
kWh
|
$1,341
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,107 | $4,300 | - | - |
$1,107
-
MMBtu
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,936 | $492 |
$1,350
128,957
kWh
|
$586
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $925 | $1,000 |
$925
31,067
kWh
|
- | - | - | - | - | |
09 | 2.7314: Reduce ventilation air | $861 | $1,000 |
$142
4,689
kWh
|
- |
$719
-
MMBtu
|
- | - | - | |
10 | 2.3132: Recharge batteries on during off-peak demand periods | $330 | - | - |
$330
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $70,970 | $72,777 |
$4,468
233,294
kWh
|
$2,257
-
kW-mo/yr
|
$6,570
-
MMBtu
|
$19,300
-
Tgal
|
$24,500
-
gal
|
$13,875 | ||
TOTAL IMPLEMENTED | $26,012 | $40,325 |
$142
4,689
kWh
|
- |
$6,570
-
MMBtu
|
$19,300
-
Tgal
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs