ITAC Assessment: WI0255
ITAC logo
ITAC Assessment: WI0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Display Printing (Litho/Silk screen)
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 120,000
ft2
Annual Production 0
units
Production Hrs. Annual 3,560
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,275 1,029,601
kWh
Natural Gas $19,351 10,903
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,156 $4,639 n/a $3,156
40,445
kWh
- - -
02 2.7135: Install occupancy sensors $1,141 $300 n/a $1,141
14,654
kWh
- - -
03 2.6215: Shut off air conditioning in winter heating season $2,897 $6,500 n/a $2,897
17,878
kWh
- - -
04 2.7221: Lower temperature during the winter season and vice-versa $2,521 - n/a - $2,521
-
MMBtu
- -
05 2.7221: Lower temperature during the winter season and vice-versa $1,060 - n/a $1,060
13,482
kWh
- - -
06 2.7251: Reduce air conditioning load by evaporating water from roof $1,281 $3,600 n/a $1,281
19,343
kWh
- - -
07 2.7447: Install vinyl strip / high speed / air curtain doors $808 $950 n/a - $808
-
MMBtu
- -
08 2.2515: Use optimum thickness insulation $671 $1,067 n/a - $671
-
MMBtu
- -
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $615 - n/a $615
-
kWh
- - -
10 3.6192: Use a less expensive method of waste removal $5,100 - n/a - - - $5,100
11 3.5311: Recover and reuse waste material $1,150 - n/a - - $1,150
-
gal
-
TOTAL RECOMMENDED $20,400 $17,056 $10,150
105,802
kWh
$4,000
-
MMBtu
$1,150
-
gal
$5,100
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs