ITAC Assessment: RU0055
ITAC logo
ITAC Assessment: RU0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PLASTIC FILMS
NAICS
n/a
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 48,000,000
lb
Production Hrs. Annual 8,640
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,187,177 25,670,282
kWh
Natural Gas $187,355 45,417
MMBtu
Fuel Oil #2 $80,513 19,648
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $162,118 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,638

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4221: Install compressor air intakes in coolest locations $5,975 $594 $5,975
129,836
kWh
- -
02 2.2428: Use flue gases in radiant heater for space heating, ovens, etc $80,513 $66,700 - - $80,513
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,194 $4,800 $3,194
69,461
kWh
- -
04 2.4312: Improve lubrication practices $2,844 $800 $2,844
61,841
kWh
- -
05 3.4115: Recover and reuse cooling water $18,842 - $18,842
409,730
kWh
- -
06 2.7243: Improve air circulation with destratification fans / other methods $5,303 $5,220 $(-317.0)
(-7,034)
kWh
$5,620
-
MMBtu
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $8,150 $3,200 $8,150
177,315
kWh
- -
08 2.3212: Optimize plant power factor $31,000 $13,500 $31,000
-
kWh
- -
09 2.7111: Reduce illumination to minimum necessary levels $3,933 - $3,933
85,580
kWh
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,364 - $2,364
51,290
kWh
- -
TOTAL RECOMMENDED $162,118 $94,814 $75,985
978,019
kWh
$5,620
-
MMBtu
$80,513
-
MMBtu
TOTAL IMPLEMENTED $17,638 $10,820 $12,018
261,138
kWh
$5,620
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs