| Assessment Year | 1995 |
|---|---|
| Principal Product | Springs, wire forms |
| NAICS |
n/a
|
| SIC | 3496: Miscellaneous Fabricated Wire Products |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
300,000
ft2
|
| Annual Production | 168,000,000
lb
|
| Production Hrs. Annual | 5,250
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $297,019 | 4,665,006 |
kWh
|
$0.064 |
| Natural Gas | $92,119 | 25,940 |
MMBtu
|
$3.55 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,581 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,459 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,879 | $9,720 |
$14,879
233,587
kWh
|
- | - | |
| 02 | 2.7135: Install occupancy sensors | $601 | $375 |
$601
9,379
kWh
|
- | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,548 | - |
$1,548
24,326
kWh
|
- | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $552 | $1,500 |
$552
8,499
kWh
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,416 | $1,280 |
$1,416
21,981
kWh
|
- | - | |
| 06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $719 | $656 | - |
$719
-
MMBtu
|
- | |
| 07 | 2.2511: Insulate bare equipment | $126 | $525 | - |
$126
-
MMBtu
|
- | |
| 08 | 2.2692: Use outside cold water source as a supply of cooling water | $2,740 | $6,000 | - | - |
$2,740
-
Tgal
|
|
| TOTAL RECOMMENDED | $22,581 | $20,056 |
$18,996
297,772
kWh
|
$845
-
MMBtu
|
$2,740
-
Tgal
|
||
| TOTAL IMPLEMENTED | $3,459 | $6,656 | - |
$719
-
MMBtu
|
$2,740
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs