Assessment Year | 1995 |
---|---|
Principal Product | Springs, wire forms |
NAICS |
n/a
|
SIC | 3496: Miscellaneous Fabricated Wire Products |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
300,000
ft2
|
Annual Production | 168,000,000
lb
|
Production Hrs. Annual | 5,250
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $297,019 | 4,665,006 |
kWh
|
$0.064 |
Natural Gas | $92,119 | 25,940 |
MMBtu
|
$3.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,581 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,459 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,879 | $9,720 |
$14,879
233,587
kWh
|
- | - | |
02 | 2.7135: Install occupancy sensors | $601 | $375 |
$601
9,379
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,548 | - |
$1,548
24,326
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $552 | $1,500 |
$552
8,499
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,416 | $1,280 |
$1,416
21,981
kWh
|
- | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $719 | $656 | - |
$719
-
MMBtu
|
- | |
07 | 2.2511: Insulate bare equipment | $126 | $525 | - |
$126
-
MMBtu
|
- | |
08 | 2.2692: Use outside cold water source as a supply of cooling water | $2,740 | $6,000 | - | - |
$2,740
-
Tgal
|
|
TOTAL RECOMMENDED | $22,581 | $20,056 |
$18,996
297,772
kWh
|
$845
-
MMBtu
|
$2,740
-
Tgal
|
||
TOTAL IMPLEMENTED | $3,459 | $6,656 | - |
$719
-
MMBtu
|
$2,740
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs