Assessment Year | 1995 |
---|---|
Principal Product | Canned vegetables |
NAICS |
n/a
|
SIC | 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies |
Sales Range | $10 M to 50M |
# of Employees | 73 |
Plant Area |
275,000
ft2
|
Annual Production | 2,000,000
pieces
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $101,302 | 1,388,921 |
kWh
|
$0.073 |
Natural Gas | $84,316 | 41,975 |
MMBtu
|
$2.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,366 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,248 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $7,236 | $13,720 |
$8,198
112,251
kWh
|
$(-962.0)
-
MMBtu
|
|
02 | 2.1213: Direct warmest air to combustion intake | $2,691 | $64 | - |
$2,691
-
MMBtu
|
|
03 | 2.2136: Install / repair insulation on steam lines | $1,741 | $4,508 | - |
$1,741
-
MMBtu
|
|
04 | 2.2511: Insulate bare equipment | $1,344 | $3,612 | - |
$1,344
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,224 | $2,077 |
$1,224
16,706
kWh
|
- | |
06 | 2.2511: Insulate bare equipment | $882 | $2,480 | - |
$882
-
MMBtu
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $199 | $240 |
$199
2,638
kWh
|
- | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $49 | $76 |
$49
586
kWh
|
- | |
TOTAL RECOMMENDED | $15,366 | $26,777 |
$9,670
132,181
kWh
|
$5,696
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,248 | $10,577 |
$1,472
19,930
kWh
|
$5,776
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs