ITAC Assessment: WI0248
ITAC logo
ITAC Assessment: WI0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Pneumatic Cylinders
NAICS
n/a
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 75,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 5,600
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,694 1,158,558
kWh
Natural Gas $9,609 2,562
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,952 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,634

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $3,240 $800 - $3,240
-
MMBtu
-
02 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,647 $7,000 - - $2,647
03 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $2,170 $1,000 $2,170
33,998
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $779 $640 $779
12,309
kWh
- -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $656 $2,000 $656
10,258
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $539 $2,160 $539
8,499
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $157 $514 $157
2,345
kWh
- -
08 2.3132: Recharge batteries on during off-peak demand periods $488 - $488
-
kWh
- -
09 2.6218: Turn off equipment when not in use $276 - $276
4,396
kWh
- -
TOTAL RECOMMENDED $10,952 $14,114 $5,065
71,805
kWh
$3,240
-
MMBtu
$2,647
TOTAL IMPLEMENTED $9,634 $11,314 $3,747
50,997
kWh
$3,240
-
MMBtu
$2,647
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs