ITAC Assessment: WI0247
ITAC logo
ITAC Assessment: WI0247
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Packaging of Cheese
NAICS
n/a
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 32,000
ft2
Annual Production 52,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,509 1,870,750
kWh
Natural Gas $22,552 6,381
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,915 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,262

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $4,423 - - - $4,423
02 2.3137: Use power during off-peak periods $2,146 $1,000 $2,146
-
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $931 $1,443 $931
19,930
kWh
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $888 $2,000 $888
-
kWh
- -
05 2.2437: Recover waste heat from equipment $844 $2,000 - $844
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $683 $640 $683
14,654
kWh
- -
07 2.3132: Recharge batteries on during off-peak demand periods $648 $2,000 $648
-
kWh
- -
08 2.7261: Install timers and/or thermostats $203 $200 - $203
-
MMBtu
-
09 2.2437: Recover waste heat from equipment $149 $500 - $149
-
MMBtu
-
TOTAL RECOMMENDED $10,915 $9,783 $5,296
34,584
kWh
$1,196
-
MMBtu
$4,423
TOTAL IMPLEMENTED $2,262 $4,083 $2,262
34,584
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs