ITAC Assessment: AM0913
ITAC logo
ITAC Assessment: AM0913
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Pet food
NAICS 311111: Dog and Cat Food Manufacturing
SIC 2047: Dog and Cat Food
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 110,000
ft2
Annual Production 115,000
ton
Production Hrs. Annual 8,135
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $604,012 12,577,700
kWh
Electricity Demand $169,846 24,041
kW-mo/yr
Electricity Fees $60,752 -
Natural Gas $507,493 114,860
MMBtu
TOTAL YEARLY COSTS $1,342,103
RECOMMENDED SAVINGS* $720,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $206,260 $1,610,000 $374,890
9,134,740
kWh
$115,590
-
kW-mo/yr
- $(-284,220.0)
-
MMBtu
-
02 2.8121: Apply for tax-free status for energy purchases $430,200 $10,000 - - $86,040 - $344,160
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $48,970 $2,000 $37,400
914,000
kWh
$11,570
-
kW-mo/yr
- - -
04 2.2113: Repair or replace steam traps $12,600 $2,200 - - - $12,600
-
MMBtu
-
05 2.3212: Optimize plant power factor $10,340 $19,040 - $10,340
-
kW-mo/yr
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,090 - $3,870
94,500
kWh
$1,220
-
kW-mo/yr
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $4,000 $15 $3,060
74,665
kWh
$940
-
kW-mo/yr
- - -
08 2.2511: Insulate bare equipment $2,610 $415 - - - $2,610
-
MMBtu
-
TOTAL RECOMMENDED $720,070 $1,643,670 $419,220
10,217,905
kWh
$139,660
-
kW-mo/yr
$86,040 $(-269,010.0)
-
MMBtu
$344,160
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs