ITAC Assessment: WI0245
ITAC logo
ITAC Assessment: WI0245
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Valves for fluid control
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 75,000
ft2
Annual Production 48,000
pieces
Production Hrs. Annual 2,750
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,768 1,276,964
kWh
Natural Gas $12,410 3,446
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,875 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,086

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $3,645 $10,000 $3,645
-
kWh
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,239 $2,000 $1,239
19,343
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $722 $1,946 $722
11,430
kWh
-
04 2.7135: Install occupancy sensors $141 $300 $141
2,345
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $720 $700 - $720
-
MMBtu
06 2.2437: Recover waste heat from equipment $351 $1,000 - $351
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $137 $100 $137
2,052
kWh
-
08 2.7221: Lower temperature during the winter season and vice-versa $283 - - $283
-
MMBtu
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $518 - $518
8,206
kWh
-
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $119 - $119
1,758
kWh
-
TOTAL RECOMMENDED $7,875 $16,046 $6,521
45,134
kWh
$1,354
-
MMBtu
TOTAL IMPLEMENTED $3,086 $5,046 $2,735
42,789
kWh
$351
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs