| Assessment Year | 1995 |
|---|---|
| Principal Product | Valves for fluid control |
| NAICS |
n/a
|
| SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 90 |
| Plant Area |
75,000
ft2
|
| Annual Production | 48,000
pieces
|
| Production Hrs. Annual | 2,750
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $81,768 | 1,276,964 |
kWh
|
$0.064 |
| Natural Gas | $12,410 | 3,446 |
MMBtu
|
$3.60 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,875 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,086 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3191: Use demand controller or load shedder | $3,645 | $10,000 |
$3,645
-
kWh
|
- | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,239 | $2,000 |
$1,239
19,343
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $722 | $1,946 |
$722
11,430
kWh
|
- | |
| 04 | 2.7135: Install occupancy sensors | $141 | $300 |
$141
2,345
kWh
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $720 | $700 | - |
$720
-
MMBtu
|
|
| 06 | 2.2437: Recover waste heat from equipment | $351 | $1,000 | - |
$351
-
MMBtu
|
|
| 07 | 2.4221: Install compressor air intakes in coolest locations | $137 | $100 |
$137
2,052
kWh
|
- | |
| 08 | 2.7221: Lower temperature during the winter season and vice-versa | $283 | - | - |
$283
-
MMBtu
|
|
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $518 | - |
$518
8,206
kWh
|
- | |
| 10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $119 | - |
$119
1,758
kWh
|
- | |
| TOTAL RECOMMENDED | $7,875 | $16,046 |
$6,521
45,134
kWh
|
$1,354
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $3,086 | $5,046 |
$2,735
42,789
kWh
|
$351
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs