| Assessment Year | 1995 |
|---|---|
| Principal Product | Wax for investment casting |
| NAICS |
n/a
|
| SIC | 2911: Petroleum Refining |
| Sales Range | $10 M to 50M |
| # of Employees | 40 |
| Plant Area |
95,000
ft2
|
| Annual Production | 7,000,000
lb
|
| Production Hrs. Annual | 2,550
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $68,470 | 920,281 |
kWh
|
$0.074 |
| Natural Gas | $75,669 | 21,812 |
MMBtu
|
$3.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $34,819 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,646 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1213: Direct warmest air to combustion intake | $4,132 | $10,000 | - |
$4,132
-
MMBtu
|
- | - | |
| 02 | 2.7261: Install timers and/or thermostats | $6,975 | $400 | - |
$6,975
-
MMBtu
|
- | - | |
| 03 | 2.1224: Replace boiler | $3,712 | $12,000 | - |
$3,712
-
MMBtu
|
- | - | |
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,111 | $6,000 |
$2,635
35,463
kWh
|
$(-524.0)
-
MMBtu
|
- | - | |
| 05 | 2.3191: Use demand controller or load shedder | $1,773 | $1,500 |
$1,773
-
kWh
|
- | - | - | |
| 06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,126 | $538 | - |
$1,126
-
MMBtu
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $898 | $1,796 |
$898
12,016
kWh
|
- | - | - | |
| 08 | 2.7241: Install outside air damper / economizer on hvac unit | $445 | $700 |
$445
5,862
kWh
|
- | - | - | |
| 09 | 2.2511: Insulate bare equipment | $248 | $672 | - |
$248
-
MMBtu
|
- | - | |
| 10 | 3.3128: Utilize other methods to remove contaminants | $13,399 | $9,000 | - |
$(-500.0)
-
MMBtu
|
$17,019
-
lb
|
$(-3,120.0) | |
| TOTAL RECOMMENDED | $34,819 | $42,606 |
$5,751
53,341
kWh
|
$15,169
-
MMBtu
|
$17,019
-
lb
|
$(-3,120.0) | ||
| TOTAL IMPLEMENTED | $9,646 | $3,696 |
$2,671
12,016
kWh
|
$6,975
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs