ITAC Assessment: DS0050
ITAC logo
ITAC Assessment: DS0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Metal Fabrication
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 51,025
ft2
Annual Production 6,068,938
lb
Production Hrs. Annual 6,660
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,451 2,219,812
kWh
Electricity Demand $28,162 7,716
kW-mo/yr
Electricity Fees $1,329 -
Natural Gas $42,439 4,154
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,006 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $94,006

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,357 $8,346 $1,809
50,410
kWh
$548
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $1,931 $1,299 $1,475
39,859
kWh
$456
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,213 $220 $5,213
144,783
kWh
- - -
04 2.6218: Turn off equipment when not in use $895 - $895
24,912
kWh
- - -
05 3.2121: Convert to electrostatic powder coating $19,183 $4,200 - - $19,057
-
gal
$126
-
lb
06 3.2121: Convert to electrostatic powder coating $64,427 $6,000 - - $64,364
-
gal
$63
-
lb
TOTAL RECOMMENDED $94,006 $20,065 $9,392
259,964
kWh
$1,004
-
kW-mo/yr
$83,421
-
gal
$189
-
lb
TOTAL IMPLEMENTED $94,006 $20,065 $9,392
259,964
kWh
$1,004
-
kW-mo/yr
$83,421
-
gal
$189
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs