ITAC Assessment: TN0313
ITAC logo
ITAC Assessment: TN0313
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product AUTOMOTIVE HARDWARE
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area
n/a
Annual Production 6,000,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $210,180 3,971,278
kWh
Natural Gas $146,516 21,078
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,844 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,684

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $13,202 $8,130 - $13,202
-
MMBtu
02 2.7243: Improve air circulation with destratification fans / other methods $6,160 $10,750 - $6,160
-
MMBtu
03 2.7111: Reduce illumination to minimum necessary levels $13,250 - $13,250
250,000
kWh
-
04 2.2136: Install / repair insulation on steam lines $3,696 $972 - $3,696
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,202 $225 $8,202
154,748
kWh
-
06 2.2514: Cover open tanks $3,024 $1,651 - $3,024
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,722 $300 - $1,722
-
MMBtu
08 2.2511: Insulate bare equipment $588 $470 - $588
-
MMBtu
TOTAL RECOMMENDED $49,844 $22,498 $21,452
404,748
kWh
$28,392
-
MMBtu
TOTAL IMPLEMENTED $43,684 $11,748 $21,452
404,748
kWh
$22,232
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs