ITAC Assessment: WI0232
ITAC logo
ITAC Assessment: WI0232
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Semi finished ice cream, yogurt, whipped cream, and non-dair
NAICS
n/a
SIC 2023: Dry, Condensed, and Evaporated Dairy Products
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 40,000
ft2
Annual Production 8,000
Tgal
Production Hrs. Annual 5,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,211 2,248,242
kWh
Natural Gas $61,757 12,978
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,499 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $3,507 $500 - $3,507
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $2,343 $10,000 - $2,343
-
MMBtu
03 2.7221: Lower temperature during the winter season and vice-versa $3,427 $20 - $3,427
-
MMBtu
04 2.7221: Lower temperature during the winter season and vice-versa $1,004 - - $1,004
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,246 $1,805 $3,246
44,549
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $188 - $188
2,638
kWh
-
07 2.7444: Close holes and openings in building such as broken windows $401 $260 - $401
-
MMBtu
08 2.4221: Install compressor air intakes in coolest locations $244 $640 $244
3,224
kWh
-
09 2.3131: Reschedule plant operations or reduce load to avoid peaks $139 - $139
-
kWh
-
TOTAL RECOMMENDED $14,499 $13,225 $3,817
50,411
kWh
$10,682
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs