Assessment Year | 1994 |
---|---|
Principal Product | Custom Molded Fiberglass, Reinforced plastic parts for varie |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 180 |
Plant Area |
250,000
ft2
|
Annual Production | 22,500,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $412,284 | 6,346,131 |
kWh
|
$0.065 |
Natural Gas | $255,223 | 74,784 |
MMBtu
|
$3.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,858 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,380 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $6,282 | $20,000 | - |
$6,282
-
MMBtu
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,005 | $500 | - |
$1,005
-
MMBtu
|
|
03 | 2.2136: Install / repair insulation on steam lines | $4,811 | $3,581 | - |
$4,811
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,994 | $4,917 |
$3,994
61,547
kWh
|
- | |
05 | 2.7135: Install occupancy sensors | $254 | $300 |
$254
3,810
kWh
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $3,037 | $960 |
$3,037
46,893
kWh
|
- | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,111 | $2,550 | - |
$2,111
-
MMBtu
|
|
08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $789 | - |
$789
-
kWh
|
- | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $575 | $120 |
$575
8,792
kWh
|
- | |
TOTAL RECOMMENDED | $22,858 | $32,928 |
$8,649
121,042
kWh
|
$14,209
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,380 | $8,618 |
$4,569
70,339
kWh
|
$4,811
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs