ITAC Assessment: WI0216
ITAC logo
ITAC Assessment: WI0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Buns, Rolls, and Fried Chips
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 357
Plant Area
n/a
Annual Production 40,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $308,387 4,826,788
kWh
Natural Gas $221,283 60,901
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,262 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,481 $3,024 n/a $4,481
70,047
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,518 $2,400 n/a $3,518
55,100
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $4,178 $6,000 n/a - $4,178
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $2,828 $960 n/a $2,828
44,256
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,645 $1,824 n/a $2,645
41,325
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $455 - n/a $455
7,034
kWh
-
07 2.2414: Use waste heat from hot flue gases to preheat $2,424 $5,000 n/a - $2,424
-
MMBtu
08 2.3132: Recharge batteries on during off-peak demand periods $1,733 - n/a $1,733
-
kWh
-
TOTAL RECOMMENDED $22,262 $19,208 $15,660
217,762
kWh
$6,602
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs