| Assessment Year | 1994 |
|---|---|
| Principal Product | Buns, Rolls, and Fried Chips |
| NAICS |
n/a
|
| SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
| Sales Range | $50 M to 100M |
| # of Employees | 357 |
| Plant Area |
n/a
|
| Annual Production | 40,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $308,387 | 4,826,788 |
kWh
|
$0.064 |
| Natural Gas | $221,283 | 60,901 |
MMBtu
|
$3.63 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,262 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,481 | $3,024 | n/a |
$4,481
70,047
kWh
|
- |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,518 | $2,400 | n/a |
$3,518
55,100
kWh
|
- |
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,178 | $6,000 | n/a | - |
$4,178
-
MMBtu
|
| 04 | 2.4221: Install compressor air intakes in coolest locations | $2,828 | $960 | n/a |
$2,828
44,256
kWh
|
- |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,645 | $1,824 | n/a |
$2,645
41,325
kWh
|
- |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $455 | - | n/a |
$455
7,034
kWh
|
- |
| 07 | 2.2414: Use waste heat from hot flue gases to preheat | $2,424 | $5,000 | n/a | - |
$2,424
-
MMBtu
|
| 08 | 2.3132: Recharge batteries on during off-peak demand periods | $1,733 | - | n/a |
$1,733
-
kWh
|
- |
| TOTAL RECOMMENDED | $22,262 | $19,208 |
$15,660
217,762
kWh
|
$6,602
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs