| Assessment Year | 1994 |
|---|---|
| Principal Product | Plastic fastening devices and cable ties |
| NAICS |
n/a
|
| SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
| Sales Range | $5 M to 10M |
| # of Employees | 80 |
| Plant Area |
60,000
ft2
|
| Annual Production | 250,000,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $214,734 | 2,919,109 |
kWh
|
$0.074 |
| Natural Gas | $16,207 | 2,787 |
MMBtu
|
$5.82 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,381 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,001 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2511: Insulate bare equipment | $5,416 | $492 |
$5,416
73,564
kWh
|
- | - | - | |
| 02 | 2.8113: Purchase gas directly from a contract gas supplier | $4,049 | $500 | - | - | - | $4,049 | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,829 | $2,021 |
$1,829
24,912
kWh
|
- | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $488 | $1,760 |
$488
6,741
kWh
|
- | - | - | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $978 | $1,329 | - |
$978
-
MMBtu
|
- | - | |
| 06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $585 | $370 | - |
$585
-
MMBtu
|
- | - | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $543 | $464 |
$543
7,327
kWh
|
- | - | - | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $346 | $960 |
$346
4,689
kWh
|
- | - | - | |
| 09 | 2.6218: Turn off equipment when not in use | $147 | - |
$147
2,052
kWh
|
- | - | - | |
| 10 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,000 | $7,000 | - | - |
$3,000
-
lb
|
- | |
| TOTAL RECOMMENDED | $17,381 | $14,896 |
$8,769
119,285
kWh
|
$1,563
-
MMBtu
|
$3,000
-
lb
|
$4,049 | ||
| TOTAL IMPLEMENTED | $9,001 | $7,862 |
$5,416
73,564
kWh
|
$585
-
MMBtu
|
$3,000
-
lb
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs