Assessment Year | 1994 |
---|---|
Principal Product | Plastic fastening devices and cable ties |
NAICS |
n/a
|
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $5 M to 10M |
# of Employees | 80 |
Plant Area |
60,000
ft2
|
Annual Production | 250,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $214,734 | 2,919,109 |
kWh
|
$0.074 |
Natural Gas | $16,207 | 2,787 |
MMBtu
|
$5.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,381 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,001 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $5,416 | $492 |
$5,416
73,564
kWh
|
- | - | - | |
02 | 2.8113: Purchase gas directly from a contract gas supplier | $4,049 | $500 | - | - | - | $4,049 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,829 | $2,021 |
$1,829
24,912
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $488 | $1,760 |
$488
6,741
kWh
|
- | - | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $978 | $1,329 | - |
$978
-
MMBtu
|
- | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $585 | $370 | - |
$585
-
MMBtu
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $543 | $464 |
$543
7,327
kWh
|
- | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $346 | $960 |
$346
4,689
kWh
|
- | - | - | |
09 | 2.6218: Turn off equipment when not in use | $147 | - |
$147
2,052
kWh
|
- | - | - | |
10 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,000 | $7,000 | - | - |
$3,000
-
lb
|
- | |
TOTAL RECOMMENDED | $17,381 | $14,896 |
$8,769
119,285
kWh
|
$1,563
-
MMBtu
|
$3,000
-
lb
|
$4,049 | ||
TOTAL IMPLEMENTED | $9,001 | $7,862 |
$5,416
73,564
kWh
|
$585
-
MMBtu
|
$3,000
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs