ITAC Assessment: UD0023
ITAC logo
ITAC Assessment: UD0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product AUTOMOTIVE PRESSURE SWITCHES
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 2,500,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,244 2,562,134
kWh
Natural Gas $1,011 231
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,376 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,376

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7492: Use proper thickness of insulation on building envelope $7,104 $6,705 $7,104
155,334
kWh
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $14,006 $3,864 $14,006
282,239
kWh
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,266 $300 $3,266
46,014
kWh
TOTAL RECOMMENDED $24,376 $10,869 $24,376
483,587
kWh
TOTAL IMPLEMENTED $24,376 $10,869 $24,376
483,587
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs