ITAC Assessment: KU0201
ITAC logo
ITAC Assessment: KU0201
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product METAL HAND RAILINGS
NAICS
n/a
SIC 3446: Architectural and Ornamental Metal Work
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area
n/a
Annual Production 1,040,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,793 491,794
kWh
Natural Gas $26,525 6,921
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,205 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,663

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $2,771 $5,500 $2,771
33,411
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,677 $1,581 $1,677
20,223
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,483 $120 $1,483
17,878
kWh
- -
04 2.4312: Improve lubrication practices $1,460 $2,135 $1,460
17,585
kWh
- -
05 2.2532: Use only amount of air necessary to prevent explosion hazard $1,243 $90 $186
2,345
kWh
$1,057
-
MMBtu
-
06 2.2414: Use waste heat from hot flue gases to preheat $1,118 $2,100 - $1,118
-
MMBtu
-
07 2.2532: Use only amount of air necessary to prevent explosion hazard $740 $10 $144
1,758
kWh
$596
-
MMBtu
-
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $173 $1,500 $216
2,638
kWh
$(-43.0)
-
MMBtu
-
09 2.6214: Shut off pilots in standby equipment $590 - - $540
-
MMBtu
$50
10 2.4231: Reduce the pressure of compressed air to the minimum required $480 $50 $480
5,862
kWh
- -
11 2.7221: Lower temperature during the winter season and vice-versa $155 - $155
1,758
kWh
- -
12 2.4221: Install compressor air intakes in coolest locations $177 $200 $177
2,052
kWh
- -
13 2.6121: Reduce hot water temperature to the minimum required $138 - $138
1,758
kWh
- -
TOTAL RECOMMENDED $12,205 $13,286 $8,887
107,268
kWh
$3,268
-
MMBtu
$50
TOTAL IMPLEMENTED $7,663 $4,136 $5,420
65,357
kWh
$2,193
-
MMBtu
$50
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs