| Assessment Year | 1994 |
|---|---|
| Principal Product | chillers, condensers, heat exchangers |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
160,000
ft2
|
| Annual Production | 30,000
pieces
|
| Production Hrs. Annual | 4,125
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $197,501 | 1,794,256 |
kWh
|
$0.11 |
| Natural Gas | $60,231 | 22,584 |
MMBtu
|
$2.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $38,483 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,761 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2612: Use cooling tower water instead of refrigeration | $10,895 | $20,000 |
$10,895
-
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,761 | $8,956 |
$10,761
97,890
kWh
|
- | |
| 03 | 2.7135: Install occupancy sensors | $290 | $150 |
$290
2,638
kWh
|
- | |
| 04 | 2.7134: Use photocell controls | $116 | $75 |
$116
1,172
kWh
|
- | |
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $8,734 | $21,885 | - |
$8,734
-
MMBtu
|
|
| 06 | 2.2511: Insulate bare equipment | $258 | $912 | - |
$258
-
MMBtu
|
|
| 07 | 2.4221: Install compressor air intakes in coolest locations | $3,426 | $2,920 |
$3,426
31,067
kWh
|
- | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,316 | $2,257 |
$3,316
30,188
kWh
|
- | |
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $687 | - |
$687
6,155
kWh
|
- | |
| TOTAL RECOMMENDED | $38,483 | $57,155 |
$29,491
169,110
kWh
|
$8,992
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,761 | $8,956 |
$10,761
97,890
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs