Assessment Year | 1994 |
---|---|
Principal Product | chillers, condensers, heat exchangers |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
160,000
ft2
|
Annual Production | 30,000
pieces
|
Production Hrs. Annual | 4,125
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $197,501 | 1,794,256 |
kWh
|
$0.11 |
Natural Gas | $60,231 | 22,584 |
MMBtu
|
$2.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,483 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,761 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2612: Use cooling tower water instead of refrigeration | $10,895 | $20,000 |
$10,895
-
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,761 | $8,956 |
$10,761
97,890
kWh
|
- | |
03 | 2.7135: Install occupancy sensors | $290 | $150 |
$290
2,638
kWh
|
- | |
04 | 2.7134: Use photocell controls | $116 | $75 |
$116
1,172
kWh
|
- | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $8,734 | $21,885 | - |
$8,734
-
MMBtu
|
|
06 | 2.2511: Insulate bare equipment | $258 | $912 | - |
$258
-
MMBtu
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $3,426 | $2,920 |
$3,426
31,067
kWh
|
- | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,316 | $2,257 |
$3,316
30,188
kWh
|
- | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $687 | - |
$687
6,155
kWh
|
- | |
TOTAL RECOMMENDED | $38,483 | $57,155 |
$29,491
169,110
kWh
|
$8,992
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,761 | $8,956 |
$10,761
97,890
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs