ITAC Assessment: KG0033
ITAC logo
ITAC Assessment: KG0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Steel Casting,Valves,Oil Industri Tools,Crane & Cable Parts
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 197,500
ft2
Annual Production 4,000
ton
Production Hrs. Annual 2,750
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $897,772 15,792,790
kWh
Natural Gas $243,859 97,656
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,655 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1113: Reduce combustion air flow to optimum $26,990 $5,000 - $26,990
-
MMBtu
02 2.1113: Reduce combustion air flow to optimum $10,625 $2,500 - $10,625
-
MMBtu
03 2.4133: Use most efficient type of electric motors $4,597 $17,060 $4,597
90,563
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,788 $767 $1,788
33,705
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,330 $2,480 $1,330
34,877
kWh
-
06 2.4314: Use synthetic lubricant $325 - $325
24,912
kWh
-
TOTAL RECOMMENDED $45,655 $27,807 $8,040
184,057
kWh
$37,615
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs