ITAC Assessment: WI0193
ITAC logo
ITAC Assessment: WI0193
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Newspaper Printing
NAICS
n/a
SIC 2711: Newspapers: Publishing, or Publishing and Printing
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 80,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,800
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $214,592 2,702,521
kWh
Natural Gas $68,819 17,550
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,584 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,935

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1212: Operate boilers on high fire setting $11,935 $4,500 - $11,935
-
MMBtu
02 2.1213: Direct warmest air to combustion intake $1,243 $5,000 - $1,243
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,297 $3,758 $2,297
29,015
kWh
-
04 2.7134: Use photocell controls $335 $450 $335
4,103
kWh
-
05 2.7135: Install occupancy sensors $256 $150 $256
3,224
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $503 $1,280 $503
6,448
kWh
-
07 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $740 $3,780 $740
12,016
kWh
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $275 - $275
3,517
kWh
-
TOTAL RECOMMENDED $17,584 $18,918 $4,406
58,323
kWh
$13,178
-
MMBtu
TOTAL IMPLEMENTED $11,935 $4,500 - $11,935
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs