ITAC Assessment: UD0043
ITAC logo
ITAC Assessment: UD0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product CUSTOM PLASTIC MOLDERS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 207
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,926 1,659,730
kWh
Natural Gas $600 138
MMBtu
LPG $4,310 458
MMBtu
Fuel Oil #2 $14,269 1,821
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,152 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $729

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $935 $380 $1,090
20,809
kWh
$(-155.0)
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $729 $700 $729
13,482
kWh
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,488 $5,000 $11,488
126,612
kWh
-
TOTAL RECOMMENDED $13,152 $6,080 $13,307
160,903
kWh
$(-155.0)
-
MMBtu
TOTAL IMPLEMENTED $729 $700 $729
13,482
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs