ITAC Assessment: UM0366
ITAC logo
ITAC Assessment: UM0366
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Autophoretic Coating of Parts
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 50,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,381 762,300
kWh
Natural Gas $179,255 17,059
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,541 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,202

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,000 $14,000 $10,000
90,000
kWh
-
02 2.7135: Install occupancy sensors $200 $200 $200
2,000
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $139 $1,000 $139
1,304
kWh
-
04 2.2511: Insulate bare equipment $2,117 $596 - $2,117
-
MMBtu
05 2.7444: Close holes and openings in building such as broken windows $85 $31 - $85
-
MMBtu
TOTAL RECOMMENDED $12,541 $15,827 $10,339
93,304
kWh
$2,202
-
MMBtu
TOTAL IMPLEMENTED $2,202 $627 - $2,202
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs