ITAC Assessment: WI0191
ITAC logo
ITAC Assessment: WI0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Liquid pressure vessels
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 40,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,606 397,714
kWh
Natural Gas $13,951 3,319
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,732 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,705

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2514: Cover open tanks $2,679 $600 $2,679
23,447
kWh
- -
02 2.7447: Install vinyl strip / high speed / air curtain doors $1,589 $5,142 - $1,589
-
MMBtu
-
03 2.8113: Purchase gas directly from a contract gas supplier $4,820 $500 - - $4,820
04 2.1212: Operate boilers on high fire setting $1,499 - - $1,499
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $959 $500 - $959
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $618 $640 $618
5,275
kWh
- -
07 2.7135: Install occupancy sensors $403 $525 $403
3,517
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $165 $301 $165
1,465
kWh
- -
TOTAL RECOMMENDED $12,732 $8,208 $3,865
33,704
kWh
$4,047
-
MMBtu
$4,820
TOTAL IMPLEMENTED $5,705 $1,926 $3,247
28,429
kWh
$2,458
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs