Assessment Year | 1993 |
---|---|
Principal Product | Liquid pressure vessels |
NAICS |
n/a
|
SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
40,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $45,606 | 397,714 |
kWh
|
$0.11 |
Natural Gas | $13,951 | 3,319 |
MMBtu
|
$4.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,732 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,705 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.2514: Cover open tanks | $2,679 | $600 |
$2,679
23,447
kWh
|
- | - | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,589 | $5,142 | - |
$1,589
-
MMBtu
|
- | |
03 | 2.8113: Purchase gas directly from a contract gas supplier | $4,820 | $500 | - | - | $4,820 | |
04 | 2.1212: Operate boilers on high fire setting | $1,499 | - | - |
$1,499
-
MMBtu
|
- | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $959 | $500 | - |
$959
-
MMBtu
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $618 | $640 |
$618
5,275
kWh
|
- | - | |
07 | 2.7135: Install occupancy sensors | $403 | $525 |
$403
3,517
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $165 | $301 |
$165
1,465
kWh
|
- | - | |
TOTAL RECOMMENDED | $12,732 | $8,208 |
$3,865
33,704
kWh
|
$4,047
-
MMBtu
|
$4,820 | ||
TOTAL IMPLEMENTED | $5,705 | $1,926 |
$3,247
28,429
kWh
|
$2,458
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs