ITAC Assessment: TT0275
ITAC logo
ITAC Assessment: TT0275
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Hydraulic Motors and Transmissions
NAICS 333996: Fluid Power Pump and Motor Manufacturing
SIC 3594: Fluid Power Pumps and Motors
Sales Range $100
M
to 500
M
# of Employees 448
Plant Area 250,000
ft2
Annual Production 150,000
units
Production Hrs. Annual 8,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,308,258 18,860,400
kWh
Electricity Demand $475,215 39,043
kW-mo/yr
Natural Gas $40,332 17,096
MMBtu
TOTAL YEARLY COSTS $1,823,805
RECOMMENDED SAVINGS* $78,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,121

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $32,630 $34,500 - - $32,630 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,633 $2,905 $14,633
210,850
kWh
- - -
03 4.424: Improve space comfort conditioning $11,751 $28,120 $11,299
162,805
kWh
$452
-
kW-mo/yr
- -
04 2.9114: Use solar heat to make electricty $8,032 $30,830 $8,032
115,739
kWh
- - -
05 2.7224: Reduce space conditioning during non-working hours $5,126 $50 $5,126
73,863
kWh
- - -
06 2.7229: Air condition only space necessary $3,488 $9,000 $1,228
17,584
kWh
- - $2,260
-
MMBtu
07 2.2437: Recover waste heat from equipment $1,643 $2,500 - - - $1,643
-
MMBtu
08 2.6212: Turn off equipment during breaks, reduce operating time $1,083 $500 $1,083
15,607
kWh
- - -
TOTAL RECOMMENDED $78,386 $108,405 $41,401
596,448
kWh
$452
-
kW-mo/yr
$32,630 $3,903
-
MMBtu
TOTAL IMPLEMENTED $18,121 $11,905 $15,861
228,434
kWh
- - $2,260
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs