ITAC Assessment: TA0021
ITAC logo
ITAC Assessment: TA0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Conduit and Conduit Fitting
NAICS
n/a
SIC 3644: Noncurrent-Carrying Wiring Devices
Sales Range $10
M
to 50
M
# of Employees 167
Plant Area 134,915
ft2
Annual Production 3,000
units
Production Hrs. Annual 4,250
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,403 6,401,016
kWh
Electricity Demand $85,127 16,790
kW-mo/yr
Electricity Fees $6,938 -
Natural Gas $203,041 32,326
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,798 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,062

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings
01 2.2136: Install / repair insulation on steam lines $11,450 $5,883 - $11,450
-
MMBtu
-
02 2.2121: Increase amount of condensate returned $9,736 $19,010 - $3,160
-
MMBtu
$6,576
-
MMBtu
03 2.2135: Repair and eliminate steam leaks $6,110 $190 - $6,110
-
MMBtu
-
04 2.2511: Insulate bare equipment $864 $504 - $864
-
MMBtu
-
05 2.7121: Utilize daylight whenever possible in lieu of artificial light $535 - $535
16,320
kWh
- -
06 2.7124: Make a practice of turning off lights when not needed $103 - $103
3,168
kWh
- -
TOTAL RECOMMENDED $28,798 $25,587 $638
19,488
kWh
$21,584
-
MMBtu
$6,576
-
MMBtu
TOTAL IMPLEMENTED $19,062 $6,577 $638
19,488
kWh
$18,424
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs