ITAC Assessment: WI0188
ITAC logo
ITAC Assessment: WI0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Roofing Product
NAICS
n/a
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 35,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,500
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,455 182,884
kWh
Natural Gas $14,932 3,280
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,260 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,773

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $3,239 $2,000 - $3,239
-
MMBtu
02 2.7224: Reduce space conditioning during non-working hours $1,978 $600 - $1,978
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,228 $1,399 $1,228
9,672
kWh
-
04 2.7135: Install occupancy sensors $665 $225 $665
5,275
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $594 - $594
4,689
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $556 $1,600 $556
4,396
kWh
-
TOTAL RECOMMENDED $8,260 $5,824 $3,043
24,032
kWh
$5,217
-
MMBtu
TOTAL IMPLEMENTED $5,773 $4,200 $556
4,396
kWh
$5,217
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs