ITAC Assessment: TN0378
ITAC logo
ITAC Assessment: TN0378
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product SOLID OAK WOOD FLOORING
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area
n/a
Annual Production 10,000,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $353,571 6,829,719
kWh
Wood $438,000 315,362
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $380,646 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,710

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Administrative Changes Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $342,613 $1,000,000 $353,571
6,829,719
kWh
$(-109,508.0)
-
MMBtu
$98,550
02 2.2414: Use waste heat from hot flue gases to preheat $13,140 $34,440 - $13,140
-
MMBtu
-
03 2.2136: Install / repair insulation on steam lines $5,681 $2,167 - $5,681
-
MMBtu
-
04 2.2135: Repair and eliminate steam leaks $2,083 $540 - $2,083
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,802 $7,500 $7,802
150,059
kWh
- -
06 2.6122: Adjust vents to minimize energy use $5,334 $8,450 $5,334
102,579
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,301 $120 $2,301
44,256
kWh
- -
08 2.6232: Install set-back timers $1,524 - $1,524
29,308
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $168 $135 $168
3,224
kWh
- -
TOTAL RECOMMENDED $380,646 $1,053,352 $370,700
7,159,145
kWh
$(-88,604.0)
-
MMBtu
$98,550
TOTAL IMPLEMENTED $13,710 $8,160 $11,627
223,623
kWh
$2,083
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs