| Assessment Year | 1995 |
|---|---|
| Principal Product | Utility Truck Bodies |
| NAICS |
n/a
|
| SIC | 3713: Truck and Bus Bodies |
| Sales Range | $50 M to 100M |
| # of Employees | 300 |
| Plant Area |
196,600
ft2
|
| Annual Production | 2,000
pieces
|
| Production Hrs. Annual | 2,550
hrs
|
| Location (State) | Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $285,621 | 4,394,490 |
kWh
|
$0.065 |
| Natural Gas | $78,721 | 12,810 |
MMBtu
|
$6.15 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,254 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,128 | $500 |
$1,128
17,292
kWh
|
|
| 02 | 2.2437: Recover waste heat from equipment | $697 | $465 |
$697
33,118
kWh
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $72 | $200 |
$72
1,172
kWh
|
|
| 04 | 2.4133: Use most efficient type of electric motors | $109 | $352 |
$109
1,758
kWh
|
|
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $377 | $831 |
$377
5,862
kWh
|
|
| 06 | 2.7135: Install occupancy sensors | $3,871 | $7,073 |
$3,871
59,496
kWh
|
|
| TOTAL RECOMMENDED | $6,254 | $9,421 |
$6,254
118,698
kWh
|
||
| TOTAL IMPLEMENTED | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs