| Assessment Year | 1993 |
|---|---|
| Principal Product | Process Control Valves |
| NAICS |
n/a
|
| SIC | 3492: Fluid Power Valves and Hose Fittings |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
86,000
ft2
|
| Annual Production | 63,000
pieces
|
| Production Hrs. Annual | 2,275
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $65,140 | 812,134 |
kWh
|
$0.080 |
| Natural Gas | $9,719 | 3,224 |
MMBtu
|
$3.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,188 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,895 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7243: Improve air circulation with destratification fans / other methods | $2,974 | $4,960 | - |
$2,974
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,295 | $5,659 |
$2,295
28,722
kWh
|
- | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $1,270 | - |
$1,270
15,826
kWh
|
- | |
| 04 | 2.7241: Install outside air damper / economizer on hvac unit | $1,354 | $2,800 |
$1,354
16,999
kWh
|
- | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $776 | $500 | - |
$776
-
MMBtu
|
|
| 06 | 2.3133: Consider three or four days around-the-clock operation rather than one or two shifts per day | $736 | - |
$736
-
kWh
|
- | |
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $625 | $700 | - |
$625
-
MMBtu
|
|
| 08 | 2.4221: Install compressor air intakes in coolest locations | $158 | $640 |
$158
2,052
kWh
|
- | |
| TOTAL RECOMMENDED | $10,188 | $15,259 |
$5,813
63,599
kWh
|
$4,375
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $1,895 | $700 |
$1,270
15,826
kWh
|
$625
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs