Assessment Year | 1993 |
---|---|
Principal Product | Process Control Valves |
NAICS |
n/a
|
SIC | 3492: Fluid Power Valves and Hose Fittings |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
86,000
ft2
|
Annual Production | 63,000
pieces
|
Production Hrs. Annual | 2,275
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $65,140 | 812,134 |
kWh
|
$0.080 |
Natural Gas | $9,719 | 3,224 |
MMBtu
|
$3.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,188 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,895 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7243: Improve air circulation with destratification fans / other methods | $2,974 | $4,960 | - |
$2,974
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,295 | $5,659 |
$2,295
28,722
kWh
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $1,270 | - |
$1,270
15,826
kWh
|
- | |
04 | 2.7241: Install outside air damper / economizer on hvac unit | $1,354 | $2,800 |
$1,354
16,999
kWh
|
- | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $776 | $500 | - |
$776
-
MMBtu
|
|
06 | 2.3133: Consider three or four days around-the-clock operation rather than one or two shifts per day | $736 | - |
$736
-
kWh
|
- | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $625 | $700 | - |
$625
-
MMBtu
|
|
08 | 2.4221: Install compressor air intakes in coolest locations | $158 | $640 |
$158
2,052
kWh
|
- | |
TOTAL RECOMMENDED | $10,188 | $15,259 |
$5,813
63,599
kWh
|
$4,375
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,895 | $700 |
$1,270
15,826
kWh
|
$625
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs