ITAC Assessment: MA0646
ITAC logo
ITAC Assessment: MA0646
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Overhaul and repair of gas turbine fuel nozzles
NAICS 811310: Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Main
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $10
M
to 50
M
# of Employees 84
Plant Area 43,000
ft2
Annual Production 26,258
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,651 879,753
kWh
Electricity Demand $48,593 2,275
kW-mo/yr
Electricity Fees $4,700 -
Natural Gas $70,250 3,568
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,864 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,288

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $7,158 $8,683 $2,278
17,377
kWh
$4,880
-
MMBtu
02 2.2524: Avoid cooling of process streams or materials that must subsequently be heated $5,780 - $5,780
44,460
kWh
-
03 2.2437: Recover waste heat from equipment $1,968 $3,610 - $1,968
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,508 $300 $1,508
11,607
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,450 $5,195 - $1,450
-
MMBtu
TOTAL RECOMMENDED $17,864 $17,788 $9,566
73,444
kWh
$8,298
-
MMBtu
TOTAL IMPLEMENTED $7,288 $300 $7,288
56,067
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs