Assessment Year | 1997 |
---|---|
Principal Product | Rotational Molded Plastics |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 58 |
Plant Area |
45,000
ft2
|
Annual Production | 1,848,057
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $16,073 | 837,339 |
kWh
|
$0.019 |
Electricity Demand | $6,638 | 21,864 |
kW-mo/yr
|
$0.30 |
Electricity Fees | $1,770 | - |
|
- |
Natural Gas | $56,374 | 14,840 |
MMBtu
|
$3.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,896 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,334 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.1163: Use plastic pallets instead of wood | $11,530 | $1,830 | - | - | - |
$430
-
lb
|
$(-2,340.0) | $13,440 | |
02 | 4.423: Move product using mechanical means | $9,625 | $14,810 |
$(-340.0)
(-13,189)
kWh
|
$(-85.0)
-
kW-mo/yr
|
- | - | $10,050 | - | |
03 | 2.2511: Insulate bare equipment | $4,309 | $2,320 | - | - |
$4,309
-
MMBtu
|
- | - | - | |
04 | 2.2437: Recover waste heat from equipment | $2,930 | $8,750 |
$665
34,584
kWh
|
$2,265
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,635 | $2,500 |
$852
39,859
kWh
|
$783
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $169 | $670 |
$80
4,103
kWh
|
$89
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4133: Use most efficient type of electric motors | $698 | $2,017 |
$473
24,619
kWh
|
$225
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $30,896 | $32,897 |
$1,730
89,976
kWh
|
$3,277
-
kW-mo/yr
|
$4,309
-
MMBtu
|
$430
-
lb
|
$7,710 | $13,440 | ||
TOTAL IMPLEMENTED | $13,334 | $5,000 |
$932
43,962
kWh
|
$872
-
kW-mo/yr
|
- |
$430
-
lb
|
$(-2,340.0) | $13,440 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs