ITAC Assessment: SF0405
ITAC logo
ITAC Assessment: SF0405
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Canned Tomatoes
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $100
M
to 500
M
# of Employees 1,200
Plant Area 210,000
ft2
Annual Production 500,000
ton
Production Hrs. Annual 2,016
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,606,552 15,038,592
kWh
Electricity Demand $589,821 28,668
kW-mo/yr
Electricity Fees $18,018 -
Natural Gas $4,248,926 794,998
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $481,789 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $241,283

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,795 $1,200 $7,795
72,991
kWh
- - - -
02 2.2113: Repair or replace steam traps $76,949 $36,149 - - $76,949
-
MMBtu
- -
03 2.2121: Increase amount of condensate returned $139,563 $85,532 - - $139,563
-
MMBtu
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,933 $21,797 $23,995
224,672
kWh
$3,938
-
kW-mo/yr
- - -
05 2.2511: Insulate bare equipment $38,824 $39,132 - - $38,824
-
MMBtu
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,152 $11,614 $5,560
52,064
kWh
$1,592
-
kW-mo/yr
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $52,595 $93,960 $52,595
492,466
kWh
- - - -
08 2.7135: Install occupancy sensors $3,761 $9,004 $2,251
21,073
kWh
$1,510
-
kW-mo/yr
- - -
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $112,997 $524,700 $99,940
935,771
kWh
$28,644
-
kW-mo/yr
$(-15,587.0)
-
MMBtu
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $13,215 $62,332 $7,654
71,671
kWh
$2,872
-
kW-mo/yr
- $417 $2,272
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,005 $6,397 $781
7,311
kWh
$224
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $481,789 $891,817 $200,571
1,878,019
kWh
$38,780
-
kW-mo/yr
$239,749
-
MMBtu
$417 $2,272
TOTAL IMPLEMENTED $241,283 $194,217 $17,700
165,735
kWh
$4,382
-
kW-mo/yr
$216,512
-
MMBtu
$417 $2,272
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs