| Assessment Year | 1989 |
|---|---|
| Principal Product | CLEANING MACHINES |
| NAICS |
n/a
|
| SIC | 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
n/a
|
| Annual Production | 16,000
pieces
|
| Production Hrs. Annual | 2,860
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $31,344 | 640,973 |
kWh
|
$0.049 |
| Natural Gas | $18,885 | 4,694 |
MMBtu
|
$4.02 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,446 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,446 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4322: Use or replace with energy efficient substitutes | $2,830 | $1,200 | - |
$2,830
-
MMBtu
|
|
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,014 | $400 |
$159
3,224
kWh
|
$855
-
MMBtu
|
|
| 03 | 2.2437: Recover waste heat from equipment | $330 | $500 | - |
$330
-
MMBtu
|
|
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $430 | $200 | - |
$430
-
MMBtu
|
|
| 05 | 2.7261: Install timers and/or thermostats | $3,260 | $1,000 | - |
$3,260
-
MMBtu
|
|
| 06 | 2.8121: Apply for tax-free status for energy purchases | $1,325 | $100 |
$801
-
kWh
|
$524
-
MMBtu
|
|
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $417 | $900 |
$417
8,499
kWh
|
- | |
| 08 | 2.7111: Reduce illumination to minimum necessary levels | $840 | $300 |
$840
17,292
kWh
|
- | |
| TOTAL RECOMMENDED | $10,446 | $4,600 |
$2,217
29,015
kWh
|
$8,229
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,446 | $4,600 |
$2,217
29,015
kWh
|
$8,229
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs