ITAC Assessment: NC0504
ITAC logo
ITAC Assessment: NC0504
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Circuit boards
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 117
Plant Area 60,000
ft2
Annual Production 8,000,000
pieces
Production Hrs. Annual 2,100
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,581 1,059,394
kWh
Electricity Demand $12,915 3,150
kW-mo/yr
Electricity Fees $509 -
Natural Gas $12,064 1,470
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,872 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,823

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $686 $25 $499
7,938
kWh
$187
-
kW-mo/yr
- - -
02 2.6218: Turn off equipment when not in use $333 $50 $333
5,287
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $103 $100 $177
2,820
kWh
$66
-
kW-mo/yr
- $(-100.0) $(-40.0)
04 2.2437: Recover waste heat from equipment $363 $850 - - $363
-
MMBtu
- -
05 2.7111: Reduce illumination to minimum necessary levels $618 $300 $374
5,940
kWh
$130
-
kW-mo/yr
- - $114
06 2.7135: Install occupancy sensors $1,428 $2,892 $1,428
22,703
kWh
- - - -
07 2.7232: Replace existing hvac unit with high efficiency model $4,341 $21,429 $3,792
60,291
kWh
$549
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $7,872 $25,646 $6,603
104,979
kWh
$932
-
kW-mo/yr
$363
-
MMBtu
$(-100.0) $74
TOTAL IMPLEMENTED $6,823 $24,771 $6,104
97,041
kWh
$745
-
kW-mo/yr
- $(-100.0) $74
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs