| Assessment Year | 1993 |
|---|---|
| Principal Product | Printing |
| NAICS |
n/a
|
| SIC | 2752: Commercial Printing, Lithographic |
| Sales Range | $10 M to 50M |
| # of Employees | 58 |
| Plant Area |
20,000
ft2
|
| Annual Production | 20,000,000
pieces
|
| Production Hrs. Annual | 3,750
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $48,752 | 492,673 |
kWh
|
$0.099 |
| Natural Gas | $3,586 | 883 |
MMBtu
|
$4.06 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $4,980 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,796 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,125 | $1,412 |
$1,125
11,430
kWh
|
- | |
| 02 | 2.7135: Install occupancy sensors | $408 | $375 |
$408
4,103
kWh
|
- | |
| 03 | 2.7134: Use photocell controls | $194 | $100 |
$194
2,052
kWh
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,068 | $600 | - |
$1,068
-
MMBtu
|
|
| 05 | 2.7224: Reduce space conditioning during non-working hours | $948 | $400 | - |
$948
-
MMBtu
|
|
| 06 | 2.7442: Keep doors and windows shut when not on use | $460 | $192 | - |
$460
-
MMBtu
|
|
| 07 | 2.4221: Install compressor air intakes in coolest locations | $334 | $640 |
$334
3,517
kWh
|
- | |
| 08 | 2.2437: Recover waste heat from equipment | $300 | $1,000 | - |
$300
-
MMBtu
|
|
| 09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $143 | $500 | - |
$143
-
MMBtu
|
|
| TOTAL RECOMMENDED | $4,980 | $5,219 |
$2,061
21,102
kWh
|
$2,919
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $2,796 | $2,704 |
$1,125
11,430
kWh
|
$1,671
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs