ITAC Assessment: WV0101
ITAC logo
ITAC Assessment: WV0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Ventilating Louvers
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 130,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,008 1,360,199
kWh
Electricity Fees $16,658 -
Natural Gas $47,544 12,521
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,233 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,841

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $682 $347 $682
15,240
kWh
- - -
02 2.4133: Use most efficient type of electric motors $156 $450 $156
3,517
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $164 $121 $164
3,517
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $448 $240 $448
9,965
kWh
- - -
05 2.7241: Install outside air damper / economizer on hvac unit $3,091 $1,467 $3,091
69,461
kWh
- - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $9,690 $5,000 - $9,690
-
MMBtu
- -
07 2.6212: Turn off equipment during breaks, reduce operating time $5,839 - $2,381
53,634
kWh
$3,458
-
MMBtu
- -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $2,163 $10,000 $(-12.0)
(-293)
kWh
- $(-500.0) $2,675
TOTAL RECOMMENDED $22,233 $17,625 $6,910
155,041
kWh
$13,148
-
MMBtu
$(-500.0) $2,675
TOTAL IMPLEMENTED $6,841 $918 $3,383
75,908
kWh
$3,458
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs