Assessment Year | 1993 |
---|---|
Principal Product | Electronic Components |
NAICS |
n/a
|
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
17,500
ft2
|
Annual Production | 292,000
pieces
|
Production Hrs. Annual | 4,550
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $51,424 | 595,838 |
kWh
|
$0.086 |
Natural Gas | $6,586 | 1,451 |
MMBtu
|
$4.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,120 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,531 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $3,682 | $5,600 |
$3,682
42,790
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,476 | $4,167 |
$3,476
40,152
kWh
|
- | |
03 | 2.7135: Install occupancy sensors | $797 | $1,100 |
$797
9,379
kWh
|
- | |
04 | 2.7134: Use photocell controls | $175 | $400 |
$175
2,052
kWh
|
- | |
05 | 2.7224: Reduce space conditioning during non-working hours | $1,662 | $400 | - |
$1,662
-
MMBtu
|
|
06 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $1,065 | $4,600 |
$1,065
12,309
kWh
|
- | |
07 | 2.3133: Consider three or four days around-the-clock operation rather than one or two shifts per day | $852 | - |
$852
-
kWh
|
- | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $231 | $60 | - |
$231
-
MMBtu
|
|
09 | 2.2511: Insulate bare equipment | $180 | $43 |
$180
2,052
kWh
|
- | |
TOTAL RECOMMENDED | $12,120 | $16,370 |
$10,227
108,734
kWh
|
$1,893
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,531 | $5,727 |
$5,300
51,583
kWh
|
$231
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs