Assessment Year | 1993 |
---|---|
Principal Product | Rubber electrical components |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 43 |
Plant Area |
33,000
ft2
|
Annual Production | 40,000
lb
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $99,934 | 1,581,770 |
kWh
|
$0.063 |
Natural Gas | $49,622 | 17,875 |
MMBtu
|
$2.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,865 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,646 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,008 | $500 | - |
$3,008
-
MMBtu
|
|
02 | 2.7241: Install outside air damper / economizer on hvac unit | $928 | $1,400 |
$928
14,654
kWh
|
- | |
03 | 2.7135: Install occupancy sensors | $638 | $800 |
$638
9,965
kWh
|
- | |
04 | 2.7494: Install storm windows and doors | $521 | $1,482 | - |
$521
-
MMBtu
|
|
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $520 | $700 | - |
$520
-
MMBtu
|
|
06 | 2.3132: Recharge batteries on during off-peak demand periods | $448 | - |
$448
-
kWh
|
- | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $377 | $700 |
$463
7,327
kWh
|
$(-86.0)
-
MMBtu
|
|
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $235 | $352 |
$235
3,810
kWh
|
- | |
09 | 2.4221: Install compressor air intakes in coolest locations | $190 | $640 |
$190
2,931
kWh
|
- | |
TOTAL RECOMMENDED | $6,865 | $6,574 |
$2,902
38,687
kWh
|
$3,963
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,646 | $1,140 |
$638
2,931
kWh
|
$3,008
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs