Assessment Year | 1993 |
---|---|
Principal Product | Surgical Instruments |
NAICS |
n/a
|
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $10 M to 50M |
# of Employees | 211 |
Plant Area |
64,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 2,375
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $309,595 | 3,427,902 |
kWh
|
$0.090 |
Natural Gas | $16,462 | 4,584 |
MMBtu
|
$3.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,396 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $13,003 | $12,000 | n/a |
$13,003
-
kWh
|
- |
02 | 2.3133: Consider three or four days around-the-clock operation rather than one or two shifts per day | $12,067 | - | n/a |
$12,067
-
kWh
|
- |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,860 | $7,472 | n/a |
$3,860
42,790
kWh
|
- |
04 | 2.7135: Install occupancy sensors | $1,303 | $600 | n/a |
$1,303
14,361
kWh
|
- |
05 | 2.6218: Turn off equipment when not in use | $1,505 | - | n/a |
$1,505
16,706
kWh
|
- |
06 | 2.2437: Recover waste heat from equipment | $1,275 | $1,500 | n/a | - |
$1,275
-
MMBtu
|
07 | 2.4221: Install compressor air intakes in coolest locations | $1,058 | $1,280 | n/a |
$1,058
11,723
kWh
|
- |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $763 | $500 | n/a | - |
$763
-
MMBtu
|
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $285 | $1,000 | n/a | - |
$285
-
MMBtu
|
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $277 | - | n/a |
$277
3,224
kWh
|
- |
TOTAL RECOMMENDED | $35,396 | $24,352 |
$33,073
88,804
kWh
|
$2,323
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs