| Assessment Year | 1992 |
|---|---|
| Principal Product | VACUUM MATALIZED LOUVERS |
| NAICS |
n/a
|
| SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 75 |
| Plant Area |
n/a
|
| Annual Production | 600,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $400,960 | 5,185,522 |
kWh
|
$0.077 |
| Natural Gas | $16,170 | 4,695 |
MMBtu
|
$3.44 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $13,093 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,695 | - |
$3,980
49,238
kWh
|
- | $(-285.0) | |
| 02 | 2.6232: Install set-back timers | $305 | $800 |
$305
4,103
kWh
|
- | - | |
| 03 | 2.7226: Use computer programs to optimize hvac performance | $3,852 | $700 |
$3,852
49,824
kWh
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $1,958 | $180 |
$1,958
25,205
kWh
|
- | - | |
| 05 | 2.7494: Install storm windows and doors | $674 | $2,064 | - |
$674
-
MMBtu
|
- | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,590 | $1,075 |
$1,590
20,516
kWh
|
- | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $798 | $960 |
$798
10,258
kWh
|
- | - | |
| 08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $221 | - |
$221
-
kWh
|
- | - | |
| TOTAL RECOMMENDED | $13,093 | $5,779 |
$12,704
159,144
kWh
|
$674
-
MMBtu
|
$(-285.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs