ITAC Assessment: UD0936
ITAC logo
ITAC Assessment: UD0936
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Automotive Steering Components and CVT Transmission Parts
NAICS 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 474
Plant Area 286,518
ft2
Annual Production 834,000
units
Production Hrs. Annual 5,880
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $987,116 16,975,875
kWh
Electricity Demand $610,159 36,960
kW-mo/yr
Natural Gas $291,211 50,670
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,460 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,448

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,695 - $1,092
17,895
kWh
$603
-
kW-mo/yr
- -
02 2.4322: Use or replace with energy efficient substitutes $22,431 $2,260 $14,453
236,928
kWh
$7,978
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $17,704 $6,000 $4,195
68,771
kWh
$13,509
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $5,661 $825 $1,285
21,059
kWh
$4,376
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,521 $1,000 $4,459
73,104
kWh
$2,462
-
kW-mo/yr
- $(-2,400.0)
06 2.2426: Use waste heat from flue gases to heat space conditioning air $39,316 $29,746 $(-2,523.0)
(-41,366)
kWh
$(-935.0)
-
kW-mo/yr
$42,774
-
MMBtu
-
07 2.6218: Turn off equipment when not in use $530 $1,480 $530
8,695
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $12,271 $85,000 $8,422
138,070
kWh
$4,649
-
kW-mo/yr
- $(-800.0)
09 2.7135: Install occupancy sensors $4,331 $6,300 $2,574
42,201
kWh
$1,421
-
kW-mo/yr
- $336
TOTAL RECOMMENDED $108,460 $132,611 $34,487
565,357
kWh
$34,063
-
kW-mo/yr
$42,774
-
MMBtu
$(-2,864.0)
TOTAL IMPLEMENTED $41,448 $89,740 $28,956
474,692
kWh
$15,692
-
kW-mo/yr
- $(-3,200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs