ITAC Assessment: MI0224
ITAC logo
ITAC Assessment: MI0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Plastic Bags
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 51,000
ft2
Annual Production 17,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $406,873 5,278,403
kWh
Electricity Demand $49,880 10,343
kW-mo/yr
Electricity Fees $39,297 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,520 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,246

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,266 $11,960 $18,660
242,341
kWh
$1,606
-
kW-mo/yr
02 2.2511: Insulate bare equipment $14,666 $2,135 $13,156
170,857
kWh
$1,510
-
kW-mo/yr
03 2.4322: Use or replace with energy efficient substitutes $6,947 $12,324 $6,076
78,907
kWh
$871
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,323 $3,480 $4,901
63,648
kWh
$422
-
kW-mo/yr
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,130 $1,660 $2,678
34,780
kWh
$452
-
kW-mo/yr
06 2.5121: Redesign flow to minimize mass transfer length $996 $2,594 $919
11,937
kWh
$77
-
kW-mo/yr
07 2.7135: Install occupancy sensors $1,962 $520 $1,808
23,483
kWh
$154
-
kW-mo/yr
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,668 $80 $1,475
19,151
kWh
$193
-
kW-mo/yr
09 2.7145: Install skylights $1,608 $5,550 $1,354
17,597
kWh
$254
-
kW-mo/yr
10 2.7142: Utilize higher efficiency lamps and/or ballasts $954 $1,230 $877
11,392
kWh
$77
-
kW-mo/yr
TOTAL RECOMMENDED $57,520 $41,533 $51,904
674,093
kWh
$5,616
-
kW-mo/yr
TOTAL IMPLEMENTED $41,246 $33,848 $37,394
485,639
kWh
$3,852
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs