ITAC Assessment: WI0163
ITAC logo
ITAC Assessment: WI0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product TEMPERATURE METERS
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 82
Plant Area
n/a
Annual Production 7,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $53,811 642,438
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,847 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $3,157 $1,500 $3,157
37,808
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $249 - $395
4,689
kWh
$(-146.0)
03 2.6232: Install set-back timers $1,256 $2,200 $1,256
14,947
kWh
-
04 2.6232: Install set-back timers $468 $75 $468
5,569
kWh
-
05 2.7226: Use computer programs to optimize hvac performance $1,404 $4,200 $1,404
16,706
kWh
-
06 2.3191: Use demand controller or load shedder $1,104 $5,000 $1,104
-
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $209 - $209
2,638
kWh
-
TOTAL RECOMMENDED $7,847 $12,975 $7,993
82,357
kWh
$(-146.0)
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs