ITAC Assessment: WI0161
ITAC logo
ITAC Assessment: WI0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ELEVATOR COMPONENTS
NAICS
n/a
SIC 3534: Elevators and Moving Stairways
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area
n/a
Annual Production 30,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,653 1,488,863
kWh
Natural Gas $2,656 540
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,814 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,517

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,114 - $3,457
38,687
kWh
- $(-343.0)
02 2.6232: Install set-back timers $1,250 $1,200 $1,250
14,068
kWh
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,806 - $4,458
-
kWh
- $(-2,652.0)
04 2.4221: Install compressor air intakes in coolest locations $914 $1,920 $914
10,258
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $603 $128 $603
6,741
kWh
- -
06 2.6214: Shut off pilots in standby equipment $127 - - $127
-
MMBtu
-
TOTAL RECOMMENDED $7,814 $3,248 $10,682
69,754
kWh
$127
-
MMBtu
$(-2,995.0)
TOTAL IMPLEMENTED $1,517 $2,048 $1,517
16,999
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs