ITAC Assessment: AS0094
ITAC logo
ITAC Assessment: AS0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product AEROSPACE COMPONENTS
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 34
Plant Area
n/a
Annual Production 3,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,724 744,138
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,289 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,400

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $52 - $67
586
kWh
$(-15.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $82 $240 $82
879
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,427 $2,720 $1,493
14,361
kWh
$(-66.0)
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,236 $300 $1,236
12,016
kWh
-
05 2.4312: Improve lubrication practices $604 $880 $133
1,172
kWh
$471
06 2.4133: Use most efficient type of electric motors $317 $587 $317
2,931
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $571 - $571
5,569
kWh
-
TOTAL RECOMMENDED $4,289 $4,727 $3,899
37,514
kWh
$390
TOTAL IMPLEMENTED $2,400 $4,187 $2,010
19,050
kWh
$390
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs