ITAC Assessment: SD0188
ITAC logo
ITAC Assessment: SD0188
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Commercial printing for entertainment industry
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 20,000
ft2
Annual Production 0
units
Production Hrs. Annual 5,336
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,749 2,423,505
kWh
Electricity Demand $9,076 6,840
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $682,248 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,191

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
01 2.6218: Turn off equipment when not in use $6,365 $3,993 $5,950
104,338
kWh
$415
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $6,284 - $5,948
104,338
kWh
$336
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $807 $405 $807
14,068
kWh
- - -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,100 $8,500 - - $7,100 -
05 3.2171: Use an automatic plate processor $656,267 $405,000 - - - $656,267
06 4.111: Add equipment/ operators to reduce production bottleneck $5,425 $7,000 - - $5,425 -
TOTAL RECOMMENDED $682,248 $424,898 $12,705
222,744
kWh
$751
-
kW-mo/yr
$12,525 $656,267
TOTAL IMPLEMENTED $14,191 $8,905 $6,755
118,406
kWh
$336
-
kW-mo/yr
$7,100 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs